TradeRing logoTradeRing
Back to home

Free quote template

Plumbing quote template

Most plumbing quotes go wrong in the same two places: what happens when the pipework behind the wall is not what you expected, and who is supplying the fittings. Sort both in writing.

Build your quote now

Build a plumbing quote right now

Fill it in on your phone, send it on WhatsApp before you leave the driveway.

Your details

Priced items

What the customer sees

Quote from your business

TOTAL: £0
This price holds for 14 days.

Happy with that? Reply YES and I'll book you in.

£0

no VAT applied

Nothing you type here is sent to us or stored — the quote is built on your phone and goes straight into your own WhatsApp or Messages app.

Worked example: full bathroom refit

A realistic worked example you can copy line for line, then change the numbers to your own. Total: £4,680 plus VAT.

ItemDetailPrice
Strip outRemove suite, tiles and old pipework, waste removal£420
First fixNew hot, cold and waste runs in 15mm and 22mm£680
Suite installationBath, basin, WC, shower valve and screen fitted£1,150
TilingFull height to wet wall, half height elsewhere£980
SundriesAdhesive, grout, silicone, fixings, valves£310
Customer-supplied itemsSuite and tiles supplied by customer£0
Making goodPlaster patching and boxing in£1,140

What every plumbing quote must contain

Miss any of these and you leave yourself open to an argument about price when the job is done.

  • Whether you or the customer is supplying the suite, tiles and fittings
  • What happens if hidden pipework or joists need altering
  • Whether the water will be off, and for how long
  • Gas Safe or WaterSafe registration number where relevant
  • Any commissioning, certification or warranty registration
  • Making good — plastering, tiling and decoration are separate lines, not assumptions
  • Call-out rate and hourly rate for anything outside the quoted scope

Notes for this trade

Customer-supplied fittings are the biggest source of grief in plumbing. Write plainly: "Items supplied by the customer are not covered by my workmanship guarantee against manufacturing faults, and a second visit to refit a faulty item will be charged at my hourly rate."

If the property is older, add: "Price assumes existing pipework and joists are sound and accessible. If additional work is required, I will price it and agree it with you before proceeding."

Emergency and out-of-hours work should be quoted differently. State the call-out charge, what it covers (usually the first hour), and the rate after that. Verbal-only call-out pricing is where complaints come from.

For boiler work, name the make and model, the length of the manufacturer warranty, and who registers it. Customers assume registration happens automatically; make it explicit that you are doing it.

Quoting questions

How much should a plumber charge for a call-out?

Most UK plumbers charge a call-out that covers the first hour, then an hourly or half-day rate after that, with higher rates for evenings, weekends and bank holidays. Whatever you charge, say it before you get in the van rather than when you hand over the invoice.

Should I quote a fixed price or an hourly rate?

Fixed price for anything you can see and scope, such as a bathroom or a suite swap. Hourly for fault-finding and leaks, where nobody knows what is behind the wall. Never fixed-price a leak you have not traced.

Who supplies the bathroom suite?

Either works, but say so in the quote. If the customer supplies it, exclude manufacturing faults from your guarantee and state that refit visits are chargeable.

Does a plumbing quote need VAT?

Only if you are VAT registered, in which case show it as a separate line. Many sole-trader plumbers are below the threshold — if that is you, do not mention VAT at all.

Keep reading

Win the job before you get home

Leave your number and we'll show you how TradeRing captures the enquiry over the phone while you're still on site.

No obligation. We'll never pass your details on.